Prirazlomnoye field

Prirazlomnoye field is an Arctic offshore oilfield located in the Pechora Sea, south of Novaya Zemlya, Russia. The field development is based on the single stationary Prirazlomnaya platform, which is the first Arctic-class ice-resistant oil platform in the world. Commercial drilling was planned to begin in early 2012, however it was delayed at least until the Spring of 2013 due to “safety concerns”. This is the first commercial offshore oil development in the Arctic.

Prirazlomnaja7

The Prirazlomnaya rig, when it comes into sight, is a sturdy structure set about 20m (66ft)-deep on the seabed. The visible part of the platform – the “topside” – sits on a massive concrete and steel structure. The weight of this box is what keeps it in position.

Prirazlomnaja8

The field was discovered in 1989. In 1993, the development license was issued to Rosshelf, a subsidiary of Gazprom, and the field was to be operational by 2001. In June 2000, Gazprom and German energy company Wintershall signed a memorandum on cooperation in developing the Prirazlomnoye field. Also Rosneft wanted to join the project. In 2002, the license was transferred to Sevmorneftegaz, a joint venture of Gazprom and Rosneft. Later Sevmorneftegaz became a wholly owned subsidiary of Gazprom. There is a plan to pass the Prirazlomnoye development to Gazprom Neft, an oil arm of Gazprom. The name Prirazlomnoye means “at the geological fallout”.

Prirazlomnaja9

Gazprom, the Russian state-owned company which operates the rig, says that this base is so heavy that it cannot be moved, even by thick ice. The company insists that drilling here is no different just because it is in the Arctic. It says there are many rigs – off Sakhalin Island in the far east for example – which have to cope with frozen seas.
The field development concept is based on the single stationary Prirazlomnaya platform. The oil platform, constructed by Sevmash shipyard in Severodvinsk, is expected to be completed by 2011 and after that the drilling will start. The Prirazlomnaya platform would equipped with the topsides of the former Conoco’s Hutton field TLP platform, which was the first production Tension Leg Platform ever built. Produced oil will be transported by double acting shuttle oil tankers Mikhail Ulyanov and Kirill Lavrov, built in Admiralty Shipyard and operated by Sovcomflot, to Floating Storage and Offloading vessel Belokamenka, located in Kola Bay near Murmansk. Gazprom considers to build an oil refinery in Teriberka at the location of the LNG plant of the Shtokman’s development for processing oil from Prirazlomnoye and Dolginskoye fields.

Prirazlomnaja10

The concept of the development was designed by Vniigaz Institute, a subsidiary of Gazprom. The estimated maximum annual oil production volume is expected to be 6.6 million tonnes. The total investment is expected to be about US$1.03 billion.